Categories
Jacket “Vanilla Fantasy”
Knitting, Knitting ideas, Summer blouses, tops

Jacket “Vanilla Fantasy”

knitted jacket

Cross-knit summer jacket from Drops

Dimensions

S – M – L – XL – XXL – XXXL

pattern

Materials

Yarn DROPS BABY MERINO (100% wool, 50 g/175 m) 7-8-8-9-10-11 skeins
circular knitting needles 3 mm
7 buttons

Knitting density : 24 loops and 32 rows = 10x10 cm in stockinette stitch

knitted jacket
knitting pattern

Description

Note: The pattern diagrams show all the rows when viewed from the faces. sides.

Performance turns: *knit all stitches from the bottom edge to the neckline, turn the knitting and perform the reverse row.
Knit a row from the bottom edge to marker 2, turn and knit the reverse row.
Knit a row from the bottom edge to marker 3, turn and knit the reverse row.
Knit all the stitches of the row, turn the knitting and perform the reverse row.
Repeat from *, resulting in 10 rows along the bottom edge and 4 rows along the top edge.

Left shelf

Loosely cast on 152-156-160-164-172-176 sts and knit starting with knits. r.: 5 sts in garter stitch, 140-144-148-152-160-164 sts in 2x2 rib (2 knit sts, purl 2 sts, finish with 2 knit sts and 5 sts in garter stitch.
After 4 cm, perform 2 rows with a scarf pattern on all stitches, while in the 1st row evenly add 0-0-2-2-0-0 sts = 152-156-162-166-172-176 sts.
Place 3 markers: marker 1 after 78-78-84-84-90-90 p., marker 2 after 110-112-118-120-126-128 p., marker 3 after 147-151-157-161-167 -171 p.
Next persons R. continue: 5 p. with a scarf pattern, 2 p. according to pattern M.1A, 147-151-157-161-167-171 p. according to pattern M.1B, 3 p. according to pattern M.1C, 4 p. according to pattern M.2, 4 purl. p., *12 p. according to pattern M.3, 4-5-5-6-6-7 purl. p., repeat from * 3 more times, M.3, 5 p. p. and 5 p. garter stitch. Continue knitting according to the pattern and at the same time begin making turns (see description above).
After 26-28-30-33-36-39 cm from the cast-on edge (measure along the bottom edge), transfer 74-78-78-82-82-86 stitches of the neckline to the additional one. knitting needle and continue knitting on the bottom 78-78-84-84-90-90 sts.
Knit with a scarf pattern and turning rows next. way: *2 rows on the bottom 16 sts, 2 rows on the bottom 32 sts, 2 rows on 48 sts, 2 rows on 64 sts, 2 rows on all stitches.
Place a marker = side seam.
Repeat from * again, set aside these stitches for additional stitches. knitting needle

Left sleeve

Cast on 21 sts and transfer the delayed stitches from the top of the piece = 95-99-99-103-103-107 sts.
Next persons R. knit: 5 p. with a scarf pattern, 4 p. p., *M.3, 4-5-5-6-6-7 purl. p., repeat from * 3 more times, M.3, 5 p. p. and 5 p. with a scarf pattern. Continue knitting according to the pattern, performing turning rows (see description above).
When the sleeve width is 30-31-32-33-34-35 cm, close 21 sts from the bottom edge.


Next knit the back in the same way (as the left shelf) and after 46-50-54-60-66-72 cm from the side marker, put the top loops aside for additional stitches. knitting needle and continue knitting on the loops of the lower part with a garter pattern and turning rows.


After this, similarly tie the right sleeve.


Next knit the right front
symmetrically.


When the length of the elastic strap is 2 cm, follow the next step. persons R. buttonholes: knit 46-50-54-60-66-72 sts with an elastic band, 2 sts together, knit, yarn over, *knit 19-19-20-20-21-21 sts with an elastic band, 2 sts together knit, yarn over, repeat from * 5 more times, finish row with 3 stitches of elastic.
After 4 cm from the beginning of knitting the elastic band, close the loops according to the pattern.
Sew buttons.
Sew the sleeve seams.

Related posts

Leave a Reply

Required fields are marked *

en_USEnglish